Parker is a town in Douglas County on the southeast edge of the Denver metro, about 20 minutes from our Centennial office.

In Parker we replace and repair roofs, install home solar, and add batteries and EV chargers. Most of Parker is served by CORE Electric Cooperative rather than Xcel, which changes who approves your solar. The Town of Parker issues the building permits.

Who is the electric utility in Parker?

CORE Electric Cooperative. Parker's economic development office says CORE, a member-owned utility, "powers Parker, Colorado, and its surrounding areas" (Parker Economic Development). CORE was formerly called IREA. Some edge addresses may still be on Xcel, so check your bill.

How does solar on CORE work?

CORE reviews and approves the system before it connects. In Douglas County, a permit packet for a CORE customer includes a signed CORE application, and CORE won't release a production meter until after it has approved the plans (Douglas County, Photovoltaic Permits). We file CORE's paperwork early so it doesn't hold up the inspection. CORE's billing for solar differs from Xcel's, and rules change, so ask us what applies when you call.

Who issues permits in Parker?

The Town of Parker Building Division. Parker is its own town, so permits don't go through the county. We apply and meet the inspector.

What do Parker roofs deal with?

Hail. Parker is on the Front Range, which averages 10 or more days of severe hail a year (Claims Journal, 2017). See how to tell if hail damaged your roof.

HOA rules. Many Parker neighborhoods have design rules on roof color and material. For solar, Colorado law voids covenants that effectively ban it (C.R.S. 38-30-168). Bring the rules to the assessment and we work within them.

Call (888) 240-1131 or request an estimate.

Questions from Parker

Is Parker on Xcel or CORE?

Parker's economic development office says CORE Electric Cooperative powers Parker and the area around it. Check your bill. If it says CORE, your solar goes through CORE's interconnection, not Xcel's.

What does CORE need before my Parker solar can turn on?

CORE has to approve the solar plans. Douglas County's permit page notes that CORE won't release a production meter unless the release comes after it has approved the plans, so we get CORE's approval started first.

Who issues roof and solar permits in Parker?

Parker is an incorporated town, so the Town of Parker Building Division issues them, not Douglas County. We apply and schedule the inspections.

Can my Parker HOA turn down solar?

It can't ban it. Colorado law voids covenants that effectively prohibit solar, though an HOA can set reasonable rules on look and placement and has 60 days to act on an application.

Keep exploring

Answers on this site are general information about roofing and solar in Colorado, not legal, tax or insurance advice. Programs, codes and utility rules change; your written proposal and your insurer or utility have the final word.

Next step

Get a written proposal before anything starts.

Tell us about the roof, the panels or the building. We assess it, then send the scope and the price in writing.