By Nate Hadachek, CEO, Impact Energy & RoofingPart of Roofing

Fire code and the sun. Fire code keeps clear paths on the roof so firefighters can get up and work, and panels go on the faces that get good sun while leaving those paths open. In Denver that means two 36-inch pathways on separate roof slopes, plus an 18-inch clear strip on both sides of the ridge when panels cover a third of the roof or less. Other cities' rules can differ.

When an array looks like puzzle pieces, two rules are drawing the lines. The first is fire code, which reserves clear lanes on the roof for firefighters. The second is the sun: panels go where they'll produce, and the code lanes go around them. The result is groups of panels on different faces with bare strips in between.

What are fire code pathways for?

If a house with solar catches fire, firefighters may need to get onto the roof, walk it and cut openings to vent heat and smoke. A roof covered edge to edge in panels leaves them nowhere to stand and nowhere to cut. Pathways are clear lanes from the lower edge of the roof up to the ridge. Setbacks are clear strips along the ridge itself.

These rules come from the residential building and fire codes, including International Residential Code section R324 on solar energy systems, which cities adopt and amend on their own.

What does Denver require?

The City and County of Denver's solar permit rules for homes call for 1:

  • Two pathways, each at least 36 inches wide, on separate roof slopes, running from the lowest edge of the roof to the ridge.
  • An 18-inch clear setback on both sides of a horizontal ridge when panels cover a third or less of the total roof area.
  • A 36-inch clear setback on both sides of the ridge when panels cover a third or more of the roof.

On a simple gable roof, that can mean the panels stop short of the ridge and short of one edge on each side. On a cut-up roof with hips, valleys and dormers, those lanes break the array into several smaller groups.

Do other Front Range cities use the same rules?

Not always. Each city and county adopts its own version of the codes, sometimes with local changes, and fire departments can add their own requirements. A layout that passes in Denver may need changes in Castle Rock, Colorado Springs or Boulder, and the other way around. Before a design is final, it should be checked against the rules where your house sits, and the permit review is where that gets confirmed.

Why do some roof faces get no panels at all?

Sun. In Colorado, south-facing roof faces produce the most over a year. East and west faces produce less but can still be worth using. North faces usually aren't worth the panels. Shade from trees, chimneys and neighboring houses knocks out more space.

So a designer starts with the faces that get good sun, takes out the code pathways and setbacks, and fills what's left. If your best face is small or cut up by vents and skylights, the array ends up spread across two or three faces instead of one.

Does a split layout change how much power I get?

The layout itself doesn't cost you production. Splitting panels across faces is usually how you get more panels in good sun, not fewer. What matters is how much of the array sits on faces that see strong sun and how much shade hits it. Your design should show expected production for the layout you're being sold.

Do pathways and setbacks matter for roof work later?

They do. Those clear lanes are also where roofers walk and stage material. And when a roof is replaced under existing panels, the panels come off and go back on. Ask whether your city wants the reinstalled layout to meet current pathway rules, since that can change where panels go back. More in replacing a roof that already has solar. Every one of those panel groups is held on with flashed mounts, which we explain in what's under your shingles.

Save this

  • Pathways are clear lanes for firefighters, edge to ridge.
  • Denver: two 36-inch pathways on separate slopes 1.
  • Denver: 18-inch ridge setback when panels cover a third of the roof or less, 36-inch when they cover a third or more 1.
  • Other cities can differ. Check the rules where you live.
  • Panels go on faces with good sun. North faces usually stay bare.
  • Ask to see expected production for your layout.

For how we handle roofs and solar together, see roof and solar and our roofing page. Questions about a layout? Call (888) 240-1131 or request an inspection.

Questions

Why can't panels go right up to the ridge?

Fire code asks for a clear strip along the ridge so firefighters have room to work and ventilate the roof. In Denver it's 18 inches on both sides of a horizontal ridge when panels cover a third of the roof or less.

Do the ridge setbacks get bigger when more of the roof has panels?

In Denver, yes. When a third or more of the total roof area has panels, the clear setback on both sides of a horizontal ridge goes from 18 inches to 36 inches.

Can I ask for a layout with fewer, bigger panel groups?

You can ask, but the layout has to meet your city's pathway and setback rules first. Within those rules, the designer can trade off how the array looks against how much it produces.

Who checks that my solar layout meets fire code?

Your city or county reviews the plans when the permit is applied for and inspects the finished install. The installer draws the layout to meet those rules.

Sources

  1. [1]Solar Permits for Photovoltaic and Hot Water Panels. City and County of Denver
Get an estimate

Tell us about the roof, the panels or the building.

Send the form or call. We set up an assessment, then send a written proposal with the scope and the price.

Monday–Friday 9 a.m.–5 p.m.

General information about roofing and solar in Colorado, not legal, tax or insurance advice.

Answers on this site are general information about roofing and solar in Colorado, not legal, tax or insurance advice. Programs, codes and utility rules change; your written proposal and your insurer or utility have the final word.

Next step

Get a written proposal before anything starts.

Tell us about the roof, the panels or the building. We assess it, then send the scope and the price in writing.