Why is my solar installed but not turned on yet?

By Nate Hadachek, CEO, Impact Energy & RoofingPart of Solar

Two steps come after the panels go up. The local building department inspects the install against the approved plans. Then the utility gives permission to operate, called PTO, and sets your meter up to read power both ways. Only after both can the system be switched on. The wait is normal, and the system should stay off until then.

The panels are up and nothing is happening. That gap is normal. Two approvals have to land before anyone flips the switch.

What happens right after the install?

A building inspection. Your city or county sends an inspector to check that what was built matches the plans the building department approved. One of our team meets the inspector on site.

What is permission to operate?

The utility's final sign-off, usually shortened to PTO. Xcel's own outline of the residential solar process runs from the application through interconnection agreements, construction, metering and testing, and ends with permission to operate 1. Part of that is setting your meter up as a net meter, so power you send to the grid gets credited. See how net metering works with Xcel.

Why can't it run while we wait?

Until PTO, the utility has not approved your system to feed the grid, and your meter may not count exported power in your favor. Turning it on early can also cause trouble with the interconnection. Leave it off.

How long does it take?

It depends on your building department and your utility, and both vary by season. We don't quote a number of days because it isn't ours to control. What we control: filing complete paperwork, booking the inspection as soon as the install is done, and being there when the inspector arrives.

What happens when PTO arrives?

We call you. Nate's line on it: we will walk you through which switches to turn, or stop by and do it ourselves, whatever is easiest for you. Then we confirm the system is producing and that your monitoring app is reporting. See how to tell your solar is working.

What should I ask before I sign?

Ask any installer who files the permit and the utility application, who meets the inspector, and who tells you when PTO arrives. If the answer is vague, expect the wait to be longer. More in what to ask before signing.

Save this

  • Install done. System stays off.
  • Step 1: building inspection against the approved plans.
  • Step 2: utility permission to operate, and the meter set up for net metering.
  • Then the system is switched on and monitoring is confirmed.
  • Ask who handles each step before you sign.

See home solar for how our installs run, or call (888) 240-1131.

Questions

What is PTO?

Permission to operate. It is the utility's sign-off that your system can connect to the grid and run. It comes after the building inspection passes.

Can I turn the system on while I wait?

No. Running before the utility approves it breaks the interconnection rules and your meter is not yet set up to credit what you send back.

Who meets the inspector?

We do. Someone from our team is on site for the inspection to walk the inspector through the install.

How will I know PTO came through?

We call you. Then we either walk you through switching it on over the phone or stop by and do it, whichever is easier for you.

Why does Colorado feel slow for this?

Each city, county and utility has its own rules and inspectors. Nate calls Colorado one of the harder states for approvals, which is why we work only here and know the offices we file with.

Sources

  1. [1]Xcel Energy's process of requesting residential rooftop solar. Xcel Energy, published by the City of Louisville, Colorado
Get an estimate

Tell us about the roof, the panels or the building.

Send the form or call. We set up an assessment, then send a written proposal with the scope and the price.

Monday–Friday 9 a.m.–5 p.m.

General information about roofing and solar in Colorado, not legal, tax or insurance advice.

Answers on this site are general information about roofing and solar in Colorado, not legal, tax or insurance advice. Programs, codes and utility rules change; your written proposal and your insurer or utility have the final word.

Next step

Get a written proposal before anything starts.

Tell us about the roof, the panels or the building. We assess it, then send the scope and the price in writing.